China Energy-Effcient Coal Pulverizer
- Type: Ball Mill
- Materials: Coal
- Capacity(Kg/H): 600
- Flame Length: 1.5-3
- Revolution r.p.m: 2400
- Trademark: WHAJ
- Specification: WHAJ-M -600
- Application: Chemistry
- Condition: New
- Outlet Temperature: 350-1400
- Motor(Kw: 18
- Pulverizer Model: High-Speed Hammer Type
- Transport Package: Standard Export Package
- Origin: Wuhan
Instructions of
Instructions of horizontal coal pulverizer
1.Structure:
The equipment is mainly composed of three parts: crushing chamber, fan room, separator.
2.Function:
Coal with size less than 40 mm can be pulverized. Pulverized coal whose size is less than 0.1 mm will be fanned into the burner, while whose size is larger than 0.1 mm will return to be pulverized again.
Operation and installation of the horizontal coal mill
Foreword
The new energy-efficient pulverized coal combustion device adopt pulverized coal injection technology to overcome disadvantages of high heating loss, unstable temperature, low temperature strength in grate firing fluidized bed furnace. It can increase the coal utilization ratio and output of the products, as well as eliminate exhaust black smoke, providing an ideal heat source for heating and drying material process.
Equipment
The device is widely used in desiccation and calcination process for rotary kiln, dryer, fixed furnace heat source equipment in building materials, metallurgy, and chemical industry. It has the same combustion effect with oil fire, gas fired and electric heat source equipment. With abundant coal resources, our coal combustion set can help save fuel and reduce costs. Compared with the oil fired and gas fired equipment, it can save 40-50% fuel cost to increase your economic benefit.
Compared to hand burning furnace, high temperature fluidized bed furnace, it has the following characteristics:
- Flame can run fast without any blocking in horizontal, rotation, suspention state.
- Burn off rate of combustible coal (volatile matter, fixed carbon, etc.): 100%.
- Coal consumption can be reduced by 28-35% compared with the hand burning furnace.
- Evaporation strength (A= W/Kgm3h) and production can be doubled when combined with horizontal coal pulverizer.
- None exhaust smoke; its blackness fully meets the Ringelmann A standard.
1 Specification
Model
WHAJ-M -150
WHAJ-M-300
WHAJ-M -500
WHAJ-M -600
Capacity(kg/h)
150
300
500
600
Outlet temperature篊
350-1400
350-1400
350-1400
350-1400
Flame length
1.5-3
1.5-3
1.5-3
1.5-3
Pulverizer Model
High-speed hammer type
High-speed hammer type
High-speed hammer type
High-speed hammer type
Motor(KW)
7.5
11
15
18
Revolution r.p.m
2600
2200
2400
2400
2. Structure and working principle
2.1 Structure
2.1.1 Pulverizer composition
It is composed by coal bucket, shells, spindle, hit coal Hammer, linings, fan, separator, equipped with bearing chamber, cylindrical roller bearings in the shell at both ends, sealing bearing chamber and bearing with felt circle, adding seal ring in latter bearing ring, fixing bearing chambered at both ends of the body with caps sealed.
2.1.2 Pulverizer
Composed by crushing chamber and fan room, 2 sets of devices are equipped>
2.1.3 pulverized coal and separator
The bottom separator is connected with upper shell; pulverized coal pipe is connected with rubber pipe>Pulverized coal can be combusted completely and provide high heating intensity for dryer to improve the dryer heating intensity, decrease heating loss and stabilize the temperature.
2.1.4Working theory
Coal feeding, coal injection, coal pulverizing, coal separation process are completed>Return pipe of the separator need to be checked constantly to prevent clogging. By using pulverized blowing technology and maximizing contact area of the coal and oxygen, our machine has very high burn-off rate. Moreover, fast operation and rotation of the pulverized coal speeds up the carbon combustion rate.
Speeding coal combustion and flame rotation, along with semi-enclosed combustion chamber and reasonable air supply, it not>The pulverized coal in the combustion chamber is almost burning fiercely and immediately, providing heat instantly to the dryer. Except some heat is absorbed by refractory in combustion chamber, most of its heat is sent into the dryer.
2.1.5 Process flow for raw coal combustion and the heat outputting:
Raw coal --- crushing chamber --- inhaled by fan machine and discharged --- pulverized coal separation --- rotated by the pulverized coal pipe --- ignition --- rotating suspension burning - - flame injecting --- to heat needed equipment
3. Equipment installation and operation
3.1 Equipment assembly
Main machine should be installed>3.2 Operation
L <20mm raw coal is loaded in the bucket of the storage, requirements for coal:
- Calorific value: 4500-6000 kcal / kg, generally 5000 kcal / kg; volatile V ≥ 25%.
- Long-flame coal or non-caking coal will be the best choice, plastic layer Y should be less than 10mm.
3. Moisture: 3-5%. It can>4. Ignition
Wood is ignited in the ignition furnace with the help of the air fan. It takes about 30-40 minutes to reach 700 篊 -800 篊 in the furnace for the first time. Then the coal pulverizer can be started off.
3.4 Note:
Pay attention to the electrical instrument and observe the equipment operating conditions.>
4.Equipment repair and maintenance
4.1 Equipment Maintenance
After the shutdown, bolts in each part needs tobe checked to ensure it is notloose.Amount of lubricating oilbefore and afterthebearing chamberneeded to be checked and rechargedin time.
4.2 Equipment Maintenance
Maintenance of equipment todo the following:
Bearing lubrication statusofbearing chamberneed to be checked, cleaned and replaced with newgreaseif grease fouling.
Check the external bolts and sturdy.
Open the main machine and check coal hammer working condition. If worn out, it needs to be replaced with new parts.
Check whether liners and bolts in the crushed parts are loose. If broken seriously, it needs to be replaced with new parts.
Check whether connecting bolts in fan blades are loose. If the blade is badly worn, it needed to be replaced with new parts.
Check the combustion chamber, clean fouling and repair the lining.
Wuhan Aojie Technology Corporation
Hubei, China
Manufacturer/Factory & Trading Company
- Sample Available
- OEM/ODM Service
- Spanish Speaker
- Factory Tour
- Industrial raw materials
- Spare parts
- Pulverized coal preparation
-
Drying equipment
- dust removal
- Others Drying equipment
- Industrial furnace
-
Coal mill
- Fan type coal mill
- Others Coal mill
-
Burners
- Gas burner
- Others Burners
ELECTRICAL TRANSMISSION SYSTEM